To start 2012, we moved the boat from the shop in Newark, CA that's been home for over a decade. Rent on the Santa Rosa, CA shop began 1/1/12, with resolutions made to get the beams built this year. At this point, the floats are complete and finish painted. The main hull is complete, with the fore-cabin and main saloon furniture mostly built. Galley, head, rear cabin, propulsion, steering, dagger, rudder, main hatches, electrical and plumbing all yet to be started.
|
successfully loaded in Newark, CA by 9am |
|
tight squeeze onto the deck of the big tilt trailer |
|
float hull #1 later the same day, barely fitting on 18' flatbed with bow in the pickup bed. various construction aluminum, not spars, riding alongside |
|
float #2 moved early the next morning, and by noon all hulls were successfully tucked in to their (hopefully) final workshop - let the beams begin! |